Runway 4R-22L Emergency Repair

runway
Runway 15-33 Rehabilitation
February 12, 2026
backhoe
NW Aviation Taxiway Development
February 12, 2026

Client: Baton Rouge Metropolitan Airport

Scope: Spalling and failed concrete was identified along Runway 4-22, Hendrick Constructions FAA team Installed Closures to the effected runway including Low Profile Barricades, Lighted Closure X’s and Issued Notams to the tower to remove and replace the effected panels and re-open the runway with minimal downtime for air traffic